Tribe Verified

Architectural Works in Progress: Site Supervision & Execution

byAjay Nirmal ArchitectsProjects across Delhi NCR; Visit office in Malviya NagarStarts from₹350 ₹ per Sq. Ft. (Built-up Area)View full gallery

A transparent look at our current sites, from foundational brickwork to final finishes. We stay involved during construction to ensure the design vision is realized exactly as planned.

A residence under construction at DLF Phase 1. This image captures the raw volume of the space, with large openings designed to maximize the penetration of natural light and air.

This video provides a walkthrough of the DLF Phase 1 residence during construction, showing the progress of stonework, door installation, and the development of double-height spaces.

The interior of the DLF Phase 1 residence during construction. Even in its unfinished state, the large window opening frames the view and demonstrates the design's focus on light.

A view of the wood-paneled ceiling and wall details being installed at the DLF Phase 1 residence. This shows the early stages of layering materials to create a contemporary aesthetic.

The facade of our upcoming residence at DLF Phase 1 under construction. The design creates a juxtaposition of balconies and projections to add detail and playfulness to the exterior.

The entrance area of the DLF Phase 1 residence during construction, showing the interplay of different levels and the application of exterior stone cladding.

An interior view of the DLF Phase 1 residence, showing the installation of wooden ceiling rafters and wall paneling, key elements of its minimalistic design.

The Yellow Line Apartment during the facade finishing stage, with scaffolding still in place. This shows the process of applying the final textures and colors to the building.

Construction of the side facade of the Yellow Line Apartment. The yellow-painted boxing for the plumbing pipes is visible, showing how a functional element was integrated into the design.

The front facade of the Yellow Line Apartment under construction, just before the final gate installation. This view shows the building as a clean volume within the streetscape.

About Works in Progress

Construction is where the concept meets reality. At our current DLF Phase 1 site, for instance, we are actively coordinating the installation of wooden ceiling rafters and interior stone cladding. We do not just hand over drawings; we are on-site during critical phases like slab casting and masonry work to ensure the structural column placement and MEP diagrams align perfectly with the interior aesthetic.

Similar work from other experts

Browse through Curated picks from other experts on mytribe