Tribe Verified

Behind the Build: Our Construction Process

byJhari & Jhari ArchitectsTakes projects across Delhi NCR; Visit studio in Malviya Nagar, New DelhiStarts from450 per sq. ft. of Facade AreaView full gallery

A great project is not just about the final render. It is about the raw work, structural integrity, and site management that happens behind the scenes. Here is how we turn plans into reality.

I am obsessed with precision. This is how I communicate with my team, sending pictures with notes to fix even the smallest issues. This ensures you get exactly what you want, with no compromises.

A residential building in the middle of its facade transformation. The entire structure is covered in scaffolding as our team works on applying new finishes and architectural elements. It's starting to shape up into a beauty.

The beginning of a major renovation project in Mehrauli. This 500 sq. yd. corner building is being stripped back to its structural frame before we begin the new construction work for multiple flats.

A video tour of the Mehrauli project site at the very early stages. You can see the bare concrete structure, debris from demolition, and the basic plumbing lines being laid out.

Safety and structural integrity are non-negotiable. This photo shows adjustable steel props supporting a newly cast concrete slab, ensuring it cures properly without any risk of sagging.

A glimpse into a residential interior project in Malviya Nagar. The video shows various stages of work happening simultaneously, from false ceiling framework to the assembly of custom TV units and storage.

This is the reality of a renovation site. It's messy but organized chaos. This video shows a space mid-renovation, with new wall panels, wardrobe carcasses, and protected flooring.

The final step of any project: the cleanup. After all the work is done, we ensure the space is thoroughly cleaned and ready for the client to move in. This was for a project in CR Park.

A shot of a balcony from our CR Park project, nearing completion. The flooring is done, and the new sliding glass doors have been installed, letting in plenty of natural light.

A close-up of the ceiling detail in the CR Park project. We installed a wooden panel to add a warm, decorative element and fitted it with spotlights for focused lighting.

About Behind the Build: Our Process on Site

You do not just get a design plan from me, you get a site that is actively managed. I personally monitor the progress using site level feedback, often identifying issues like alignment errors or material flaws before they become permanent. Whether it is ensuring a 1mm gap in cladding or checking the structural integrity of a concrete slab, my focus is on catching mistakes early so your finished space is built right the first time.

Similar work from other experts

Browse through Curated picks from other experts on mytribe