Rock Villa: A Modern Farm Resort

This project in Wakadi, Panvel, is a modern glasshouse-style villa designed to feel like a luxury resort. I focused on bringing the outdoors in with a glass facade, a large pool with a unique Merlion feature, and high-end interiors for a complete weekend getaway experience.

Gharat Farm Stay: Sustainable Eco Resort

For this eco-resort in Pali, the main principle was designing with nature, not against it. We built around existing trees and focused on amenities like a swimming pool with a slide, an artificial lake for fish farming, and open spaces with panoramic hill views.

Shri ShivSmarak: A Tribute to Maratha Heritage

This design proposal for the Grampanchayat of Pagote, Uran, is a tribute to our rich Maratha history. The architecture is inspired by forts, featuring bastion walls, a central statue of Chhatrapati Shivaji Maharaj, 3D murals of historical events, and the iconic Swarajyachi Rajmudra.

Temple Architecture & Redevelopment

I believe in creating peaceful and vibrant community spaces that honor tradition. This includes the complete redevelopment of the Shree Hanuman Mandir and the Shree Jari Mari Aai Mandir in Bhendkhal, from architectural design to intricate interior work.

Our Design Philosophy

Design is more than just looks; it's about how a space works and feels. In these videos, I share my core principles on everything from project selection to the small details like lighting and layout that make a big difference.

Our Design Studio

This is where your vision and my expertise come together. I invite you to visit my renovated design studio in Dronagiri, Navi Mumbai, where we can begin planning your dream space.